[PLM Implementation Case] Sansha Electric Manufacturing Co., Ltd.
The introduction of the PLM system has achieved significant efficiency improvements in the operations surrounding design and a transformation into a profit-oriented structure!
We would like to introduce a case study of the implementation of "Hi-PerBT Advanced BOM/PLAN" at SanSha Electric Manufacturing Co., Ltd., which manufactures and sells semiconductors and various industrial power supply devices as their application products. In order to improve the efficiency of their design operations and to respond flexibly to manufacturing tasks, the company introduced a new PLM (Product Lifecycle Management) system. After the implementation, we received feedback stating, "By reviewing the workflow, errors and issues that had previously been overlooked have become visible." [Challenges] ■ We want to efficiently manage the entire process and reduce costs. ■ The usability in terms of operation was not sufficiently refined, resulting in a burden on the users. *For more details, please refer to the PDF document or feel free to contact us.
- Company:日立ソリューションズ西日本
- Price:Other